Skip to main content
Figure 3 | Earth, Planets and Space

Figure 3

From: Re-evaluation of temperature at the updip limit of locked portion of Nankai megasplay inferred from IODP Site C0002 temperature observatory

Figure 3

Schematic thermistor configuration along thermistor string and its relationship to geological units (Expedition 332 Scientists (2011b)). The thermistor string is equipped with a 3.5-in. casing tube. In addition, T4 and T5 are set in cement, whereas T1, T2, and T3 are in sea water. PP#1 to #3 are pore pressure meters (Expedition 332 Scientists (2011b)). The depths of the thermistors were defined by distance from the instrument carrier along the thermistor string, and depth of the instrument carrier was defined by drill pipe depth (3.5-in. casing tube depth; Expedition 332 Scientists (2011b)). Logging while drilling (LWD) data including resistivity, gamma-ray, P-wave velocity (Vp), and resistivity image acquired in Hole C0002A (Expedition 314 Scientists 2009) are also shown.

Back to article page