Fig. 12

Comparison of the observed average H/V ratio with the theoretical H/V ratio. The theoretical H/V ratio was calculated using the HVSR method and adjusted 1-D velocity model. Notice the flat curve at the rock site, KTP (<1 Hz). The dashed black lines indicate the results from the initial velocity models