Fig. 2From: In-situ permeability of fault zones estimated by hydraulic tests and continuous groundwater-pressure observationsDaily groundwater-level/pressure data from Hole 1. The red arrow shows when the wellhead was closed to observe groundwater pressure. Blue arrows denote three occasions on which the wellhead was temporarily opened and a recovery test was performed after closureBack to article page