Fig. 13
From: Theory, modeling, and integrated studies in the Arase (ERG) project

The estimated stream function (left) and drift velocity distribution (right) on March 27, 2017, at 10:20 UT. In the right left panel, the estimated drift velocity distribution is shown with white arrows and the uncertainty of the drift velocity is shown with color scale