Fig. 1From: Contention between supply of hydrothermal fluid and conduit obstruction: inferences from numerical simulationsTwo-dimensional, axisymmetric computational domain. The domain extends radially to 5225 m and reaches a maximum depth of 2275 m. The red column is the conduit. A permeability reduction at PCB (permeability changeable block) is imposed at the time of conduit obstructionBack to article page