Fig. 6

Temporal change in a temperature at the crater (red line) and the observation point (black line) and b pressure at the observation point after conduit obstruction (Run 4, Mʹ = 1000 kg s−1, kʹPCB = 1.0 × 10−13 m2)
Temporal change in a temperature at the crater (red line) and the observation point (black line) and b pressure at the observation point after conduit obstruction (Run 4, Mʹ = 1000 kg s−1, kʹPCB = 1.0 × 10−13 m2)