Sample name | Distance from source | River system | Position of sampling | Loc. | Lat. (N) | Long. (E) | Gravel (wt%) | Sand (wt%) | Silt (wt%)1 |
---|---|---|---|---|---|---|---|---|---|
Pre-eruptive fluvial deposits | |||||||||
On-7 | 10.6 | Nigorigawa/Otakigawa | Pre-eruptive | 950 | 35.803 | 137.482 | 3.6 | 94.9 | 1.5 |
On-11 | 10.6 | Nigorigawa/Otakigawa | Pre-eruptive | 1207 | 35.803 | 137.482 | 0.2 | 96.1 | 3.7 |
On-14 | 10.6 | Nigorigawa/Otakigawa | Pre-eruptive | 1208 | 35.803 | 137.482 | 0.0 | 96.5 | 3.6 |
On-27 | 4.4 | Akagawa | Pre-eruptive | 1191 | 35.853 | 137.464 | 79.3 | 18.3 | 2.4 |
On-33 | 4.1 | Akagawa | Pre-eruptive | 1192 | 35.856 | 137.465 | 39.8 | 58.4 | 1.9 |
On-39 | 4.2 | Akagawa | Pre-eruptive | S114 | 35.854 | 137.464 | 9.1 | 86.6 | 4.4 |
On-40 | 4.2 | Akagawa | Pre-mudflow event, sand layer | S114 | 35.854 | 137.464 | 0.0 | 76.4 | 23.6 |
On-43 | 3.0 | Akagawa (upstream) | Pre-eruptive | S119 | 35.864 | 137.464 | 47.4 | 49.6 | 2.9 |
October 2014 rain-triggered lahar (cohesive debris flow) deposits | |||||||||
On-13 | 10.6 | Nigorigawa/Otakigawa | Middle-top | 1207 | 35.803 | 137.482 | 21.1 | 52.9 | 15.6 |
On-18 | 4.8 | Akagawa | Entire | 1199 | 35.849 | 137.466 | 60.4 | 23.7 | 10.1 |
On-29 | 4.4 | Akagawa | Bottom | 1191 | 35.853 | 137.464 | 54.1 | 24.5 | 13.3 |
On-30 | 4.4 | Akagawa | Top | 1191 | 35.853 | 137.464 | 43.4 | 30.2 | 16.1 |
On-31 | 4.4 | Akagawa | Middle | 1191 | 35.853 | 137.464 | 38.6 | 34.0 | 16.6 |
On-34 | 4.1 | Akagawa | Bottom | 1192 | 35.856 | 137.465 | 36.6 | 36.7 | 15.9 |
On-35 | 4.1 | Akagawa | Middle | 1192 | 35.856 | 137.465 | 44.5 | 31.4 | 14.2 |
On-36 | 4.1 | Akagawa | Top | 1192 | 35.856 | 137.465 | 53.1 | 26.9 | 12.0 |
On-41 | 4.2 | Akagawa | Top | S114 | 35.854 | 137.464 | 46.8 | 28.0 | 14.9 |
On-42 | 4.2 | Akagawa | Bottom-middle | S114 | 35.854 | 137.464 | 38.5 | 32.9 | 16.7 |
On-45 | 3.0 | Akagawa (upstream) | Bottom | S119 | 35.864 | 137.464 | 47.5 | 27.9 | 14.2 |
On-46 | 3.0 | Akagawa (upstream) | Middle | S119 | 35.864 | 137.464 | 52.9 | 24.3 | 13.6 |
On-47 | 3.0 | Akagawa (upstream) | Top | S119 | 35.864 | 137.464 | 39.8 | 30.7 | 17.9 |
On-50 | 4.7 | Akagawa | Middle | 1227 | 35.850 | 137.465 | 52.6 | 26.6 | 12.9 |
On-58 | 6.3 | Nigorigawa | Middle | 1232 | 35.837 | 137.469 | 68.1 | 22.7 | 6.0 |
October 2014 rain-triggered lahar (cohesive debris flow) deposits: sole fine layer | |||||||||
On-12 | 10.6 | Nigorigawa/Otakigawa | Sole layer | 1207 | 35.803 | 137.482 | 0.0 | 47.4 | 33.4 |
On-28 | 4.4 | Akagawa | Sole layer | 1191 | 35.853 | 137.464 | 0.0 | 40.3 | 35.3 |
April 2015 rain-on-snow-triggered lahar deposits | |||||||||
On-15 | 10.6 | Nigorigawa/Otakigawa | Lower | 1208 | 35.803 | 137.482 | 0.0 | 96.2 | 3.8 |
On-16 | 10.6 | Nigorigawa/Otakigawa | Upper | 1208 | 35.803 | 137.482 | 0.0 | 95.7 | 4.3 |
On-19 | 4.8 | Akagawa | Over bank (peak flow) facies | 1199 | 35.849 | 137.466 | 80.7 | 18.1 | 1.3 |
On-20 | 4.8 | Akagawa | Flow waning stage | 1199 | 35.849 | 137.466 | 40.9 | 57.4 | 1.7 |
On-48 | 10.6 | Nigorigawa/Otakigawa | Surface (bar top) | 1206 | 35.803 | 137.481 | 0.0 | 94.1 | 5.9 |
On-51 | 4.7 | Akagawa | Top | 1227 | 35.850 | 137.465 | 35.5 | 61.6 | 2.9 |
On-52 | 4.7 | Akagawa | Middle | 1227 | 35.850 | 137.465 | 67.2 | 30.3 | 2.5 |
On-53 | 4.7 | Akagawa | Bottom | 1227 | 35.850 | 137.465 | 54.0 | 43.6 | 2.4 |
On-54 | 7.3 | Nigorigawa/Denjogawa | Upper | 1228 | 35.828 | 137.471 | 74.5 | 25.1 | 0.4 |
On-55 | 7.3 | Nigorigawa/Denjogawa | Lower | 1228 | 35.828 | 137.471 | 24.0 | 75.2 | 0.8 |
On-56 | 7.3 | Nigorigawa/Denjogawa | Top | 1229 | 35.828 | 137.471 | 1.6 | 97.1 | 1.3 |
On-57 | 7.3 | Nigorigawa/Denjogawa | Middle | 1229 | 35.828 | 137.471 | 18.0 | 81.3 | 0.7 |
April 2015 rain-on-snow-triggered lahar deposits (mud drape) | |||||||||
On-21 | 4.8 | Akagawa | Entire | 1199 | 35.849 | 137.466 | 0.0 | 28.0 | 48.2 |
On-32 | 4.4 | Akagawa | Entire | 1191 | 35.853 | 137.464 | 0.0 | 22.1 | 46.9 |
September 2014 Primary deposits | |||||||||
On-64 | – | Nearby the summit | Ashfall lower | 1289 | 35.895 | 137.488 | 0.0 | 12.0 | 52.0 |
On-65 | – | Nearby the summit | Ashfall upper (aggregates) | 1289 | 35.895 | 137.488 | 0.0 | 15.2 | 50.1 |
On-66 | – | Nearby the summit | Ashfall uppermost (aggregates+reworked) | 1289 | 35.895 | 137.488 | 0.0 | 19.5 | 48.9 |
On-44 | 3.0 | Akagawa (upstream) | Ashcloud deposits? | S119 | 35.864 | 137.464 | 0.0 | 18.9 | 64.3 |
Shirakawa River deposits | |||||||||
On-22 | – | Shirakawa | Pre-eruptive fluvial deposits | 1202 | 35.854 | 137.462 | 3.8 | 94.0 | 2.1 |
On-23 | – | Shirakawa | Post-eruptive reworked ash | 1202 | 35.854 | 137.462 | 0.0 | 39.7 | 48.0 |
On-24 | – | Shirakawa | October 2014 runoff? | 1202 | 35.854 | 137.462 | 0.0 | 51.2 | 48.7 |
On-25 | – | Shirakawa | October 2014 runoff? | 1202 | 35.854 | 137.462 | 0.0 | 72.0 | 28.0 |
On-26 | – | Shirakawa | Rain-on-snow runoff/entire | 1202 | 35.854 | 137.462 | 0.2 | 86.3 | 13.5 |
Sample name | Clay (wt%) | Clay in matrix (wt%)2 | Median grainsize Mdφ3 | Mean grainsize Mz | Sorting σI | Skewness SkI | Kurtosis KG | Method4 |
---|---|---|---|---|---|---|---|---|
Pre-eruptive fluvial deposits | ||||||||
On-7 | 2.02 | 1.96 | 1.04 | − 0.15 | 1.26 | a | ||
On-11 | 2.28 | 2.26 | 0.85 | 0.03 | 1.09 | a | ||
On-14 | 2.28 | 2.25 | 0.93 | − 0.02 | 1.08 | a | ||
On-27 | − 4.28 | − 3.04 | 2.33 | 0.80 | 1.15 | a | ||
On-33 | − 0.57 | − 0.68 | 1.79 | − 0.04 | 1.05 | a | ||
On-39 | 1.10 | 1.10 | 1.60 | − 0.01 | 1.16 | a | ||
On-40 | 3.26 | 3.40 | 1.03 | 0.24 | 1.10 | a | ||
On-43 | − 0.89 | − 0.84 | 1.60 | 0.17 | 1.01 | a | ||
October 2014 rain-triggered lahar (cohesive debris flow) deposits | ||||||||
On-13 | 10.5 | 13.3 | 0.87 | 2.10 | 3.76 | 0.46 | 0.93 | b |
On-18 | 5.8 | 14.7 | − 2.52 | − 1.05 | 4.14 | 0.58 | 0.90 | b |
On-29 | 8.1 | 17.6 | − 1.84 | − 0.23 | 4.29 | 0.69 | 0.57 | b |
On-30 | 10.4 | 18.4 | 0.04 | 0.82 | 4.91 | 0.26 | 0.71 | b |
On-31 | 10.8 | 17.6 | 0.60 | 1.28 | 4.73 | 0.22 | 0.77 | b |
On-34 | 10.8 | 17.0 | 0.54 | 1.27 | 4.68 | 0.24 | 0.82 | b |
On-35 | 9.9 | 17.9 | − 0.21 | 0.41 | 5.02 | 0.25 | 0.67 | b |
On-36 | 8.0 | 17.1 | − 1.55 | − 0.35 | 4.73 | 0.42 | 0.74 | b |
On-41 | 10.3 | 19.3 | − 0.51 | 0.38 | 5.07 | 0.30 | 0.65 | b |
On-42 | 12.0 | 19.4 | 0.59 | 1.29 | 4.91 | 0.23 | 0.72 | b |
On-45 | 10.4 | 19.9 | − 0.59 | 0.65 | 4.43 | 0.54 | 0.53 | b |
On-46 | 9.2 | 19.6 | − 1.47 | 0.15 | 4.33 | 0.67 | 0.55 | b |
On-47 | 11.7 | 19.4 | 0.50 | 1.27 | 4.87 | 0.24 | 0.69 | b |
On-50 | 8.0 | 16.8 | − 1.49 | − 0.23 | 4.48 | 0.53 | 0.70 | b |
On-58 | 3.3 | 10.2 | − 3.28 | − 2.10 | 3.33 | 0.64 | 1.06 | b |
October 2014 rain-triggered lahar (cohesive debris flow) deposits: sole fine layer | ||||||||
On-12 | 19.3 | 19.3 | 4.29 | 4.74 | 3.18 | 0.19 | 0.78 | c |
On-28 | 24.3 | 24.3 | 5.40 | 5.38 | 3.08 | 0.02 | 0.70 | c |
April 2015 rain-on-snow-triggered lahar deposits | ||||||||
On-15 | 2.51 | 2.52 | 0.78 | 0.03 | 1.17 | a | ||
On-16 | 2.38 | 2.36 | 0.76 | 0.06 | 1.22 | a | ||
On-19 | − 3.17 | − 2.92 | 1.87 | 0.52 | 0.73 | a | ||
On-20 | − 0.50 | − 0.45 | 2.04 | 0.07 | 0.90 | a | ||
On-48 | 2.14 | 2.16 | 1.08 | 0.05 | 1.11 | a | ||
On-51 | − 0.26 | − 0.39 | 1.93 | − 0.05 | 1.00 | a | ||
On-52 | − 2.51 | − 1.99 | 2.56 | 0.32 | 0.82 | a | ||
On-53 | − 1.17 | − 1.04 | 1.72 | 0.18 | 1.10 | a | ||
On-54 | − 3.87 | − 2.81 | 2.07 | 0.77 | 0.58 | a | ||
On-55 | − 0.01 | − 0.18 | 1.63 | − 0.25 | 1.44 | a | ||
On-56 | 1.26 | 1.21 | 0.89 | − 0.04 | 1.20 | a | ||
On-57 | 0.25 | 0.16 | 1.30 | − 0.13 | 1.13 | a | ||
April 2015 rain-on-snow-triggered lahar deposits (mud drape) | ||||||||
On-21 | 23.8 | 23.8 | 5.52 | 5.85 | 2.50 | 0.20 | 0.77 | c |
On-32 | 31.0 | 31.0 | 6.37 | 6.36 | 2.59 | 0.02 | 0.76 | c |
September 2014 primary deposits | ||||||||
On-64 | 36.0 | 36.0 | 7.10 | 6.92 | 2.31 | − 0.09 | 0.84 | c |
On-65 | 34.7 | 34.7 | 6.99 | 6.78 | 2.47 | − 0.11 | 0.86 | c |
On-66 | 31.6 | 31.6 | 6.70 | 6.43 | 2.65 | − 0.13 | 0.89 | c |
On-44 | 16.7 | 16.7 | 5.06 | 5.69 | 2.08 | 0.46 | 1.10 | c |
Shirakawa River deposits | ||||||||
On-22 | 1.27 | 1.28 | 1.26 | 0.01 | 1.06 | a | ||
On-23 | 12.3 | 12.3 | 4.44 | 4.78 | 2.35 | 0.28 | 1.32 | c |
On-24 | 3.97 | 4.21 | 0.95 | 0.32 | 0.79 | a | ||
On-25 | 3.41 | 3.54 | 1.03 | 0.21 | 1.04 | a | ||
On-26 | 2.43 | 2.50 | 1.39 | 0.13 | 1.23 | a |