Skip to main content

Table 3 Grainsize characteristics of ashfall, October rain-triggered lahar and April ROS-triggered lahar deposits, and pre-eruptive fluvial deposits

From: Lahar characteristics as a function of triggering mechanism at a seasonally snow-clad volcano: contrasting lahars following the 2014 phreatic eruption of Ontake Volcano, Japan

Sample name

Distance from source

River system

Position of sampling

Loc.

Lat. (N)

Long. (E)

Gravel (wt%)

Sand (wt%)

Silt (wt%)1

Pre-eruptive fluvial deposits

 On-7

10.6

Nigorigawa/Otakigawa

Pre-eruptive

950

35.803

137.482

3.6

94.9

1.5

 On-11

10.6

Nigorigawa/Otakigawa

Pre-eruptive

1207

35.803

137.482

0.2

96.1

3.7

 On-14

10.6

Nigorigawa/Otakigawa

Pre-eruptive

1208

35.803

137.482

0.0

96.5

3.6

 On-27

4.4

Akagawa

Pre-eruptive

1191

35.853

137.464

79.3

18.3

2.4

 On-33

4.1

Akagawa

Pre-eruptive

1192

35.856

137.465

39.8

58.4

1.9

 On-39

4.2

Akagawa

Pre-eruptive

S114

35.854

137.464

9.1

86.6

4.4

 On-40

4.2

Akagawa

Pre-mudflow event, sand layer

S114

35.854

137.464

0.0

76.4

23.6

 On-43

3.0

Akagawa (upstream)

Pre-eruptive

S119

35.864

137.464

47.4

49.6

2.9

October 2014 rain-triggered lahar (cohesive debris flow) deposits

 On-13

10.6

Nigorigawa/Otakigawa

Middle-top

1207

35.803

137.482

21.1

52.9

15.6

 On-18

4.8

Akagawa

Entire

1199

35.849

137.466

60.4

23.7

10.1

 On-29

4.4

Akagawa

Bottom

1191

35.853

137.464

54.1

24.5

13.3

 On-30

4.4

Akagawa

Top

1191

35.853

137.464

43.4

30.2

16.1

 On-31

4.4

Akagawa

Middle

1191

35.853

137.464

38.6

34.0

16.6

 On-34

4.1

Akagawa

Bottom

1192

35.856

137.465

36.6

36.7

15.9

 On-35

4.1

Akagawa

Middle

1192

35.856

137.465

44.5

31.4

14.2

 On-36

4.1

Akagawa

Top

1192

35.856

137.465

53.1

26.9

12.0

 On-41

4.2

Akagawa

Top

S114

35.854

137.464

46.8

28.0

14.9

 On-42

4.2

Akagawa

Bottom-middle

S114

35.854

137.464

38.5

32.9

16.7

 On-45

3.0

Akagawa (upstream)

Bottom

S119

35.864

137.464

47.5

27.9

14.2

 On-46

3.0

Akagawa (upstream)

Middle

S119

35.864

137.464

52.9

24.3

13.6

 On-47

3.0

Akagawa (upstream)

Top

S119

35.864

137.464

39.8

30.7

17.9

 On-50

4.7

Akagawa

Middle

1227

35.850

137.465

52.6

26.6

12.9

 On-58

6.3

Nigorigawa

Middle

1232

35.837

137.469

68.1

22.7

6.0

October 2014 rain-triggered lahar (cohesive debris flow) deposits: sole fine layer

 On-12

10.6

Nigorigawa/Otakigawa

Sole layer

1207

35.803

137.482

0.0

47.4

33.4

 On-28

4.4

Akagawa

Sole layer

1191

35.853

137.464

0.0

40.3

35.3

April 2015 rain-on-snow-triggered lahar deposits

 On-15

10.6

Nigorigawa/Otakigawa

Lower

1208

35.803

137.482

0.0

96.2

3.8

 On-16

10.6

Nigorigawa/Otakigawa

Upper

1208

35.803

137.482

0.0

95.7

4.3

 On-19

4.8

Akagawa

Over bank (peak flow) facies

1199

35.849

137.466

80.7

18.1

1.3

 On-20

4.8

Akagawa

Flow waning stage

1199

35.849

137.466

40.9

57.4

1.7

 On-48

10.6

Nigorigawa/Otakigawa

Surface (bar top)

1206

35.803

137.481

0.0

94.1

5.9

 On-51

4.7

Akagawa

Top

1227

35.850

137.465

35.5

61.6

2.9

 On-52

4.7

Akagawa

Middle

1227

35.850

137.465

67.2

30.3

2.5

 On-53

4.7

Akagawa

Bottom

1227

35.850

137.465

54.0

43.6

2.4

 On-54

7.3

Nigorigawa/Denjogawa

Upper

1228

35.828

137.471

74.5

25.1

0.4

 On-55

7.3

Nigorigawa/Denjogawa

Lower

1228

35.828

137.471

24.0

75.2

0.8

 On-56

7.3

Nigorigawa/Denjogawa

Top

1229

35.828

137.471

1.6

97.1

1.3

 On-57

7.3

Nigorigawa/Denjogawa

Middle

1229

35.828

137.471

18.0

81.3

0.7

April 2015 rain-on-snow-triggered lahar deposits (mud drape)

 On-21

4.8

Akagawa

Entire

1199

35.849

137.466

0.0

28.0

48.2

 On-32

4.4

Akagawa

Entire

1191

35.853

137.464

0.0

22.1

46.9

September 2014 Primary deposits

 On-64

Nearby the summit

Ashfall lower

1289

35.895

137.488

0.0

12.0

52.0

 On-65

Nearby the summit

Ashfall upper (aggregates)

1289

35.895

137.488

0.0

15.2

50.1

 On-66

Nearby the summit

Ashfall uppermost (aggregates+reworked)

1289

35.895

137.488

0.0

19.5

48.9

 On-44

3.0

Akagawa (upstream)

Ashcloud deposits?

S119

35.864

137.464

0.0

18.9

64.3

Shirakawa River deposits

 On-22

Shirakawa

Pre-eruptive fluvial deposits

1202

35.854

137.462

3.8

94.0

2.1

 On-23

Shirakawa

Post-eruptive reworked ash

1202

35.854

137.462

0.0

39.7

48.0

 On-24

Shirakawa

October 2014 runoff?

1202

35.854

137.462

0.0

51.2

48.7

 On-25

Shirakawa

October 2014 runoff?

1202

35.854

137.462

0.0

72.0

28.0

 On-26

Shirakawa

Rain-on-snow runoff/entire

1202

35.854

137.462

0.2

86.3

13.5

Sample name

Clay (wt%)

Clay in matrix (wt%)2

Median grainsize Mdφ3

Mean grainsize Mz

Sorting σI

Skewness SkI

Kurtosis KG

Method4

Pre-eruptive fluvial deposits

 On-7

  

2.02

1.96

1.04

− 0.15

1.26

a

 On-11

  

2.28

2.26

0.85

0.03

1.09

a

 On-14

  

2.28

2.25

0.93

− 0.02

1.08

a

 On-27

  

− 4.28

− 3.04

2.33

0.80

1.15

a

 On-33

  

− 0.57

− 0.68

1.79

− 0.04

1.05

a

 On-39

  

1.10

1.10

1.60

− 0.01

1.16

a

 On-40

  

3.26

3.40

1.03

0.24

1.10

a

 On-43

  

− 0.89

− 0.84

1.60

0.17

1.01

a

October 2014 rain-triggered lahar (cohesive debris flow) deposits

 On-13

10.5

13.3

0.87

2.10

3.76

0.46

0.93

b

 On-18

5.8

14.7

− 2.52

− 1.05

4.14

0.58

0.90

b

 On-29

8.1

17.6

− 1.84

− 0.23

4.29

0.69

0.57

b

 On-30

10.4

18.4

0.04

0.82

4.91

0.26

0.71

b

 On-31

10.8

17.6

0.60

1.28

4.73

0.22

0.77

b

 On-34

10.8

17.0

0.54

1.27

4.68

0.24

0.82

b

 On-35

9.9

17.9

− 0.21

0.41

5.02

0.25

0.67

b

 On-36

8.0

17.1

− 1.55

− 0.35

4.73

0.42

0.74

b

 On-41

10.3

19.3

− 0.51

0.38

5.07

0.30

0.65

b

 On-42

12.0

19.4

0.59

1.29

4.91

0.23

0.72

b

 On-45

10.4

19.9

− 0.59

0.65

4.43

0.54

0.53

b

 On-46

9.2

19.6

− 1.47

0.15

4.33

0.67

0.55

b

 On-47

11.7

19.4

0.50

1.27

4.87

0.24

0.69

b

 On-50

8.0

16.8

− 1.49

− 0.23

4.48

0.53

0.70

b

 On-58

3.3

10.2

− 3.28

− 2.10

3.33

0.64

1.06

b

October 2014 rain-triggered lahar (cohesive debris flow) deposits: sole fine layer

 On-12

19.3

19.3

4.29

4.74

3.18

0.19

0.78

c

 On-28

24.3

24.3

5.40

5.38

3.08

0.02

0.70

c

April 2015 rain-on-snow-triggered lahar deposits

 On-15

  

2.51

2.52

0.78

0.03

1.17

a

 On-16

  

2.38

2.36

0.76

0.06

1.22

a

 On-19

  

− 3.17

− 2.92

1.87

0.52

0.73

a

 On-20

  

− 0.50

− 0.45

2.04

0.07

0.90

a

 On-48

  

2.14

2.16

1.08

0.05

1.11

a

 On-51

  

− 0.26

− 0.39

1.93

− 0.05

1.00

a

 On-52

  

− 2.51

− 1.99

2.56

0.32

0.82

a

 On-53

  

− 1.17

− 1.04

1.72

0.18

1.10

a

 On-54

  

− 3.87

− 2.81

2.07

0.77

0.58

a

 On-55

  

− 0.01

− 0.18

1.63

− 0.25

1.44

a

 On-56

  

1.26

1.21

0.89

− 0.04

1.20

a

 On-57

  

0.25

0.16

1.30

− 0.13

1.13

a

April 2015 rain-on-snow-triggered lahar deposits (mud drape)

 On-21

23.8

23.8

5.52

5.85

2.50

0.20

0.77

c

 On-32

31.0

31.0

6.37

6.36

2.59

0.02

0.76

c

September 2014 primary deposits

 On-64

36.0

36.0

7.10

6.92

2.31

− 0.09

0.84

c

 On-65

34.7

34.7

6.99

6.78

2.47

− 0.11

0.86

c

 On-66

31.6

31.6

6.70

6.43

2.65

− 0.13

0.89

c

 On-44

16.7

16.7

5.06

5.69

2.08

0.46

1.10

c

Shirakawa River deposits

 On-22

  

1.27

1.28

1.26

0.01

1.06

a

 On-23

12.3

12.3

4.44

4.78

2.35

0.28

1.32

c

 On-24

  

3.97

4.21

0.95

0.32

0.79

a

 On-25

  

3.41

3.54

1.03

0.21

1.04

a

 On-26

  

2.43

2.50

1.39

0.13

1.23

a

  1. 1Silt indicates particles of < 0.063 mm when manual sieving methods
  2. 2Clay/(sand + silt + clay)
  3. 3Grain characters based on Folk (1974)
  4. 4Methods: a) dry sieving, b) wet sieving and laser analyzer, and c) laser analyzer