No. | Mw | Number of faults with magnitude Mw (A) | Number of samples at each magnitude bin (B) | Total samples at each magnitude bin = A × B |
---|---|---|---|---|
1 | 6.5 | 60 | 150 | 9000 |
2 | 6.6 | 60 | 145 | 8700 |
3 | 6.7 | 60 | 139 | 8340 |
4 | 6.8 | 60 | 134 | 8040 |
5 | 6.9 | 59 | 129 | 7611 |
6 | 7.0 | 57 | 123 | 7011 |
7 | 7.1 | 57 | 118 | 6726 |
8 | 7.2 | 55 | 113 | 6215 |
9 | 7.3 | 48 | 107 | 5136 |
10 | 7.4 | 36 | 102 | 3672 |
11 | 7.5 | 27 | 96 | 2592 |
12 | 7.6 | 20 | 91 | 1820 |
13 | 7.7 | 12 | 86 | 1032 |
14 | 7.8 | 8 | 80 | 640 |
15 | 7.9 | 2 | 75 | 150 |
Total scenario | 76,685 |