Fig. 5

Schematic figure of cross-correlation analysis between seismic velocity changes (reference) and precipitation (shifted time series): a positive time lag with negative correlation and b positive time lag with positive correlation. The delay between the peaks of precipitation and seismic velocity change is represented by Δt