Skip to main content

Table 5 Specifications of the operational and repro2 products

From: New GEONET analysis strategy at GSI: daily coordinates of over 1300 GNSS CORS in Japan throughout the last quarter century

 

Operational

repro2

Period

2012-08-19 ~ 

1994-01-02 ~ 2015-02-14

Reference frame

IGS08 (2012-08-19 ~ 2012-10-06) IGb08 (2012-10-07 ~ 2017-01-28)

IGS14 (2017-01-29 ~ 2020-05-16) IGb14 (2020-05-17 ~)

IGb08

Contribution

Depend on the processing period

COD, EMR, ESA, GFZ, GRG, JPL, MIT, GTZ, ULR

  1. The AC names are abbreviated as follows: Center for Orbit Determination in Europe (COD), Natural Resources Canada (EMR), European Space Agency (ESA), Geoforschungszentrum (GFZ), Groupe de Racherche en Geodesie Spatiale (GRG), Jet Propulsion Labs (JPL), Massachusetts Institute of Technology (MIT), GFZ contribution to the IGS TIGA project (GTZ), Université de la Rochelle (ULR)