Skip to main content

Table 1. Run-up height.

From: Bed stress assessment under solitary wave run-up

 

R/h o

Square error

 

Eq. (19)

MM

NM

MM

NM

Cot ϕ

(1)

(2)

(3)

((1)–(2))2

((1)–(3))2

19.85

0.089

0.069

0.078

0.000407

0.000116

11.43

0.068

0.064

0.063

0.000016

0.000017

10.00

0.063

0.059

0.067

0.000017

0.000015

5.67

0.048

0.045

0.050

0.000004

0.000004

5.00

0.045

0.043

0.046

0.000002

0.000001

3.73

0.039

0.036

0.037

0.000008

0.000003

RMSE

0.008704

0.005404

  1. MM = Manning Method; NM = New Method.