Fig. 8.From: A scenario for the generation process of the 2011 Tohoku earthquake based on dynamic rupture simulation: Role of stress concentration and thermal fluid pressurizationVerification of numerical accuracy: moment release in case of Model-1 and the model with doubled time step.Back to article page